翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Arroyo Maldonado : ウィキペディア英語版
Maldonado Stream

The Maldonado Stream, (''Arroyo Maldonado'') is an underground storm sewer in the city Buenos Aires, Argentina, that runs below Juan B. Justo Avenue. Originally a stream draining into the Río de la Plata, its length goes through 10 of the 47 barrios of the city: Versalles, Liniers, Villa Luro, Vélez Sarsfield, Floresta, Villa Santa Rita, Villa Mitre, Caballito, Villa Crespo, and Palermo.
The stream was one of the natural limits of the city, before the Belgrano and Flores neighborhoods were incorporated. It is named after the legend of ''La Maldonado'', a woman that arrived with Pedro de Mendoza in 1536, and was abandoned in the plain, on the margins of the stream.〔(【引用サイトリンク】title=La leyenda del arroyo Maldonado )
The stream became a garbage dump in time, and during the rainy season became a polluted waterway made dangerous because of its overflows. The authorities decided via a municipal ordinance on August 25, 1924, to tube the stream as a final solution to all the problems that caused in a growing city, and in 1928 excavations started. The Maldonado drainage system, one of the most significant public works ever built in Buenos Aires, was designed as a part of a broader drainage system in the city; it was commissioned and designed by the state-owned ''Obras Sanitarias de la Nación'' and engineered by German firm Siemens-Schuckert.〔
The excavation phase required hundreds of workers and machinery. The second phase, begun in 1929, consisted of rising columns to support a gigantic slab, for which 5000 tons of rebar, 20000 tons of cement, 55000 tons of sand, and 70000 tons of gravel were used.〔(【引用サイトリンク】title=Arroyo Maldonado: el que pudo dividir la Ciudad )〕 Following these tubing and drainage works completed in 1933, a large packed soil road was erected over the stream in 1934. This road was re-inaugurated on July 9, 1937, as Juan B. Justo Avenue.〔(【引用サイトリンク】title=La avenida Juan B. Justo cumple 72 años )
Persistent seasonal flooding along the northwest stretch of the former Maldonado Stream caused by drainage overflow (which affected up to 266,000 people yearly) prompted Mayor Aníbal Ibarra in 2005 to announce complementary drain works. Ghella, a local contractor, presented the winning bid in 2007, and work began on the alleviating tunnels the following year.〔(【引用サイトリンク】title=Secretos del Maldonado: La obra que frenará las inundaciones )〕 The first of the two new tunnels was completed in 2011, and measured in length. Work on the second, larger tunnel began in 2010 and was completed in 2012; it measured in length, required 200,000 cubic meters (7 million cubic feet) of cement, and cost USD200 million.〔(【引用サイトリンク】title=Terminaron un túnel que evitará inundaciones )
==References==



抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Maldonado Stream」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.